Ready Soon Apartments Larnaca: Silverstone Residence, Metropolis Mall Area — Final Two 83–85 m² Two-Bedrooms Delivering Q3 2026
Published 30 September 2026 by Kefah Abu Gosh

Published 30 September 2026 by Kefah Abu Gosh
Published 30 September 2026 by Kefah Abu Gosh
TL;DR — Ready soon apartments Larnaca investors can let almost immediately: Silverstone Residence is at the end of construction, with delivery scheduled Q3 2026, and two of twelve units remaining — 301 (84.8 m²) and 304 (83 m²), both third-floor two-bedroom, two-bathroom apartments. The building has solar water heating, private covered carports, lift and storage, in the Metropolis Mall area of Larnaca with quick access to Mackenzie beach, Finikoudes and the airport. Pricing on registration. Project details.
Buying at completion, at a pre-sale list
Most of what abuda tracks in Larnaca delivers in 2027–2028. A building completing this quarter is a different proposition: there is nothing left to imagine — the finishes, the view from the third floor, the carport allocation can all be inspected — and income starts within weeks of contract rather than years. What makes it attractive rather than merely convenient is that the last two units are still on the project's pre-sale price list; a completed two-bed in this quarter would otherwise be marketed against a district benchmark (typical €2,300/m², Larnaca apartments +11.7% year on year per the Central Bank of Cyprus RPPI Q1 2026) that has moved since launch.
The Metropolis Mall area is Larnaca's retail and employment hub, with the motorway, the airport and the beaches all within ten to fifteen minutes. Buyers comparing it with the town centre and the seafront can buy property in Larnaca across all districts from the same hub page.
The last two units
- 301 — third floor, 84.8 m², 2 bed, 2 bath
- 304 — third floor, 83.0 m², 2 bed, 2 bath
- Twelve-unit building; ten placed
- Solar water heating, private covered carports, lift, storage
- Metropolis Mall area · quick access to Mackenzie, Finikoudes, the airport
- Delivery: Q3 2026 · Pricing on registration
Who Silverstone Residence is for
- Investors who want income now. Two third-floor two-beds, lettable on completion. Buy to let Cyprus returns on new-build two-beds in Larnaca run 4–6% gross, and since 2026 rental income is free of Special Defence Contribution.
- Corporate-let and airport-market landlords. The mall-and-airport quarter is where Larnaca's executive and crew rental demand concentrates.
- Buyers who prefer to see before they sign. By the time of contract the building is complete or nearly so.
When do I get the title deed on a new apartment in Cyprus?
Title deeds Cyprus new build buyers receive are issued after completion in two stages. First, the building receives its Certificate of Final Approval from the planning authority; second, the Land Registry issues separate title deeds for each unit, which the developer then transfers to the buyer — typically twelve to twenty-four months after delivery, sometimes faster on small buildings. In the interval, the buyer is fully protected by the Contract of Sale deposited at the Land Registry, which since 2026 carries the right of specific performance and, where the land was mortgaged, the bank's written undertaking to release the unit at 95% payment. The buyer can occupy, let and even resell (by assignment) before the deed issues. What to check is set out in Cyprus property risks 2026.
Where it fits
Other Larnaca deliveries in 2026: Savoy Residence (Q4, marina district), Hamilton Residence (Q4, final three-bed), Allure Residence (Q3, town) and Vista del Mare (Q4, sea view).
Request a briefing
hello@abuda.com · WhatsApp +49 172 983 1161 · Silverstone Residence project page.
Frequently asked questions
Q. Where is Silverstone Residence? A. The Metropolis Mall area of Larnaca — ten to fifteen minutes from Mackenzie beach, Finikoudes and the airport. Q. What is for sale? A. The final two of twelve apartments: 301 (84.8 m²) and 304 (83 m²), third-floor two-bedroom, two-bathroom units with covered carports and storage. Q. When is delivery? A. Q3 2026 — the building is at completion stage. Q. When do I receive the title deed? A. Typically 12–24 months after delivery; in the interim the deposited Contract of Sale gives specific-performance protection. Q. Is pricing published? A. Pricing and the payment schedule are released on registration.